On the 19th, the new guys start. Within days the carpenter took down the ceiling and shingles on the outside kitchen wall. He started prepping the kitchen wall to be removed. He put new sheetrock is up on the ceiling. The electrician started switching the service from 60 amp to 200 amp. He installed boxes outside and a new box downstairs.








This closet was suppose to be opened up for access into the living room. But I decided to turn it into a much needed utility closet instead. By keeping it closed, people staying over will have privacy. Also, it would provide a sound barrier if the TV is on in both rooms.